2024. 04. 19. | Teljes munkaidõ | Abony | Tenengroup Ltd.To set goals for the production team. Our factory operates with 1 shift most of the year, but during events and peak time (Mother’s Day and Christmas) we use 3 shift system to maintain high productivity. In those times, the production manager will lead the second shift to ensure all shifts will be able
Nézze későbbNe hagyja ki a munkát!
Napi új bejegyzéseket kaphat e-mailben a Shift Engineer Pest Megye.