2024. 06. 27. | Teljes munkaidõ | Fót | WHC KftOn marked-up drawings and Engineering’s inputs. Support the hardware drawing creation in Control System detailed design (wiring diagram, panel layout and construction drawing, FAT procedure, etc.),Accelerate the Design’s respond in the assembly and testing phase;Checking Bill of Material versus Construction
Nézze később